Abstract
A setup for the investigation of Coherent Diffraction Radiation from targets with various configurations as a tool for non-invasive longitudinal electron beam profile
diagnostics has been designed and installed in the CRM line of the CLIC Test Facility 3(CTF3 at CERN). In this report we present the status of the experiment.Recently we have upgraded the system by installing the second target to suppress synchrotron radiation background. In this report we shall also demonstrate the results on simulations of CDR spatial distribution from a two target configuration.
diagnostics has been designed and installed in the CRM line of the CLIC Test Facility 3(CTF3 at CERN). In this report we present the status of the experiment.Recently we have upgraded the system by installing the second target to suppress synchrotron radiation background. In this report we shall also demonstrate the results on simulations of CDR spatial distribution from a two target configuration.
Original language | English |
---|---|
Title of host publication | Proceedings of Linear Accelerators Conference: LINAC'10, Tsukuba, Japan |
Publication status | Published - Sept 2010 |