Integrated priority decision index for risk assessment in chaos : cost overruns in transport projects. / Afzal, Farman; Yunfei, Shao; Sajid, Muhammad; Afzal, Fahim.

In: Engineering, Construction and Architectural Management, 24.10.2019, p. 1-25.

Research output: Contribution to journalArticlepeer-review

Published

Standard

Integrated priority decision index for risk assessment in chaos : cost overruns in transport projects. / Afzal, Farman; Yunfei, Shao; Sajid, Muhammad; Afzal, Fahim.

In: Engineering, Construction and Architectural Management, 24.10.2019, p. 1-25.

Research output: Contribution to journalArticlepeer-review

Harvard

Afzal, F, Yunfei, S, Sajid, M & Afzal, F 2019, 'Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects', Engineering, Construction and Architectural Management, pp. 1-25. https://doi.org/10.1108/ECAM-02-2019-0079

APA

Afzal, F., Yunfei, S., Sajid, M., & Afzal, F. (2019). Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects. Engineering, Construction and Architectural Management, 1-25. https://doi.org/10.1108/ECAM-02-2019-0079

Vancouver

Afzal F, Yunfei S, Sajid M, Afzal F. Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects. Engineering, Construction and Architectural Management. 2019 Oct 24;1-25. https://doi.org/10.1108/ECAM-02-2019-0079

Author

Afzal, Farman ; Yunfei, Shao ; Sajid, Muhammad ; Afzal, Fahim. / Integrated priority decision index for risk assessment in chaos : cost overruns in transport projects. In: Engineering, Construction and Architectural Management. 2019 ; pp. 1-25.

BibTeX

@article{6d2df04d8aae450fa21246477dd2a265,
title = "Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects",
author = "Farman Afzal and Shao Yunfei and Muhammad Sajid and Fahim Afzal",
year = "2019",
month = oct,
day = "24",
doi = "10.1108/ECAM-02-2019-0079",
language = "English",
pages = "1--25",
journal = "Engineering, Construction and Architectural Management",
issn = "0969-9988",
publisher = "Emerald Group Publishing Ltd.",

}

RIS

TY - JOUR

T1 - Integrated priority decision index for risk assessment in chaos

T2 - cost overruns in transport projects

AU - Afzal, Farman

AU - Yunfei, Shao

AU - Sajid, Muhammad

AU - Afzal, Fahim

PY - 2019/10/24

Y1 - 2019/10/24

U2 - 10.1108/ECAM-02-2019-0079

DO - 10.1108/ECAM-02-2019-0079

M3 - Article

SP - 1

EP - 25

JO - Engineering, Construction and Architectural Management

JF - Engineering, Construction and Architectural Management

SN - 0969-9988

ER -